Lead times for Clopay polyurethane reduced to 2-3 weeks

We have confirmation from Clopay that the lead time for polyurethane garage doors has been reduced to 2-3 weeks beginning 02/14/2011. This is contrast to our previous post. This is great news for those wanting high insulation garage doors (up to r=17.2) like the 9130 series,9200 series, Gallery GD1SU, GD1SU, GD2LU, GD2LU and 3700 series commercial doors.  We do have access to some 9200 and 9203 doors in the most common sizes from Clopay regional center stock for immediate installation in the Chicago, IL area.

Lead times for Amarr polyurethane doors 2-3 weeks

We have been advised that the lead times for Amarr polyurethane garage doors (having an R value up to 13 !!)  remains at 2 to 3 weeks. This includes Olympus and Classica 3000 series garage doors. We are glad to see that the lead times still remain at this level as compared to Clopay (see prior post). We do have access to some Olympus doors in the most common sizes from Amarr regional center stock for immediate installation in the Chicago, IL area. Classica 3000 doors are always a special order due to the wide style configurations available.

Leads times for Clopay polyurethane doors 3-4 weeks

We have been advised that the lead times for Clopay polyurethane garage doors (having an R value up to 17.2 !!)  has been reduced to 3 to 4 weeks from the 5-7 weeks announced in December 2010. This includes 9130 series,9200 series, Gallery GD1SU, GD1SU, GD2LU, GD2LU and 3700 series commercial doors. We hope that this time will return to the standard 2 to 3 weeks soon (no comment from Clopay yet). We do have access to some 9200 and 9203 doors in the most common sizes from Clopay regional center stock for immediate installation in the Chicago, IL area.

Subscribe to polyurethane